The Circle K section is one part of the six sub-areas within the project. This section sits directly above the new tunnel which will pass through an area of unconsolidated soils and a thin bedrock layer. It is necessary to stabilize this area to prevent subsidence of the soil as tunnel drilling progresses to the city center.
Download