Skip to main content
english
norsk
english
+47 467 49 286
Service Menu
News
Events
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Dry soil mixing
Mass mixing
Wet soil mixing
Wick / PVDs / band drains
Grouting
Cavity / bulk / mine fill grouting
Compensation / fracture grouting
Jet grouting
Compaction grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
CFA piles (auger cast)
Driven precast piles
Ductile iron piles
Micropiles
Bored piles / drilled shafts
Earth retention
Contiguous pile walls
Secant pile walls
Ground anchors
SBMA
Soil nails
Sheet piles
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Mine stabilisation/void filling
Tunnelling
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Quality
Sustainability
About us
Our team
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Invoicing
News
Category
All categories
Investor relations
Strategy
Project
Workplace and people
Sort by
Oldest first
Newest first
Search all news
Clear filters
Breadcrumb
Home
News
16 articles
Project
Foundation of new bridge over Eidselva river in Ulefoss
15 Mar 2024
A new project on Eidselva river
Read article
Workplace and people
Holiday greetings from Keller Geoteknikk
21 Dec 2023
Merry Christmas and Happy Holidays!
Read article
Investor relations
Merger between Nordwest Fundamentering and Keller Geoteknikk
23 Nov 2023
Keller Geoteknikk and Nordwest Fundamentering announced the merger in September 2023
Read article
Workplace and people
Climate Competition 2023
23 Nov 2023
Since October 17th, Keller employees have been trying to live more environmentally friendly
Read article
Project
Keller signed a contract with Bane NOR
10 Jul 2023
Keller signed a contract with Bane NOR for ground improvement in Moss
Read article
Project
Wet Soil Mixing in Trondheim
5 Jul 2023
Keller Geoteknikk has introduced the Wet Soil Mixing method for the first time in Norway
Read article
Project
Signed contract for trial piling in Mjøsa
4 Jul 2023
Keller has signed a contract with Nye Veier for trial piling for the new Mjøsa bridge.
Read article
Project
Ground improvement in Gjerdrum
14 Oct 2022
Keller installed 17 500 pcs of vertical drains with a total installation length of about 250 000 m
Read article
Project
Signed contract Tangenvika Railway Bridge
21 Jul 2022
Implenia and Keller Geoteknikk signed contract of Tangenvika Railway Bridge
Read article
Project
Pile foundation in Engeløya
6 Jul 2022
Keller Geoteknikk AS in Engeløya to install pile foundations for the new bridge construction
Read article
Workplace and people
Keller celebrates Global Diversity Awareness Month
5 Oct 2021
October is Global Diversity Awareness Month
Read article
Workplace and people
Keller Insight 2020
5 Jan 2021
Keller Insight Magazine
Read article
Show more news